CWC management currently uses thea job order costing system because each product, standard windows or custom windows, requires unique designsdesign. CostThe cost of products is determined by actual direct costs and overhead using a predetermined rate to the actual volume of the allocation base (normal costing). CWC allocates their overhead costs using the facility-wide rate, based on machine hours. Total costs for each product are accumulated using the job cost sheet. The product costs for each product fully absorb the manufacturing costs (absorption costing).
The text above was approved for publishing by the original author.
Previous
     
Next
Gehen Sie einfach in Ihren Posteingang, klicken Sie auf den Bestätigungslink, den wir Ihnen gesendet haben, und Sie bekommen den korrigierten Text zurück. Wenn Sie mehr E-Mails korrigiert haben wollen, können Sie einfach:
Oder