From swotthe SWOT analysis, we have more than one project and, so the organization is not profitable. weWe will depend on its needneeds and the development of technology in determining which project will be implemented.
First Project system class room management
Problem :
In university appear problem, problems appear every day,. When the lecture begins, the doctor discovers that there is a problem in with the computer, the electricity and projecter the projector. Then talksthe doctor talks with thethose responsible to find a class room available at time the time, sobut this method delaydelays the lecture and is therefore undesirable . Also, some time notsometimes no class room is available at time then remainthe time, so lecture remains in the class room and continue problem them the problems continue. This is a problem disturber for studentbecause it disturbs the students and the doctor .
Follow displayThe follow displays the impact hisof this problem on the university:
Delay of lecture.
Disturber for studentDisturbs students and the doctor .
Closing the class room .
Cancel the lecture.
Failure to achieve the required curriculum development.
second project system help desk
This is the problem: not system has been found system to request Maintenance.
The text above was approved for publishing by the original author.
Previous
     
Next
Gehen Sie einfach in Ihren Posteingang, klicken Sie auf den Bestätigungslink, den wir Ihnen gesendet haben, und Sie bekommen den korrigierten Text zurück. Wenn Sie mehr E-Mails korrigiert haben wollen, können Sie einfach:
Oder